A commercial crossover and driveway approach in Kwinana that needed a proper compactable base before the paving crew could start — the existing ground had soft spots and an uneven fall toward the street.
We brought crushed limestone in, trimmed it to the paver depth the client specified and compacted it in passes to a firm, even base. Existing site levels and drainage falls were kept in mind throughout so water still moves the right way once the surface goes down.
Handed over firm underfoot and true to level, with the driveway edge cut clean against the existing concrete — ready for the paving trade to start without needing to touch the base again.
- Location
- Kwinana
- Category
- Driveways
- Duration
- 2 days
- →Crushed limestone base
- →Trim to level
- →Compaction